Created Nov 08 2017, 2:00 PM by Leszek Tymoteusz Zemke
  • Georgia - projects

 

2017 – Georgia, Secondary Road Improvement Project

Road project. The project road is a 50.404-km west to east secondary road, starting from E60 in Dzirula and ending at E60 junction at Chumateleti. Most of the project road is within Imereti Region with a few kilometers within Shida Kartli Region, through a gorge with mountain ranges with on both the northern and southern part.

2017 - Georgia, Secondary Road Improvement Project (map).png

Technical description
The project focuses on improving the existing section of Dzirula-Chumateleti a 50 km two lane secondary road. The details of the proposed road project are:
  • Rehabilitate and pave the project road from Dzirula to Chumateleti according to Georgian National Standard for Public Motor Roads (SST Gzebi 2009), Geometrical and Structural  Requirements  with 40  km/h  design speed.  The  pavement within  Kharagauli  town may remain as is since this is still in fair to good pavement condition.
  • Replace or repair of 19 bridges and 149 culverts.
  • Construction of side drains and other drainage structures.
  • Provision of retaining walls and river protection measures, where necessary.
  • Provision of adequate road signing and marking.
  • Provision of safety barriers.

The design elements for the cross section of the project road are as follows:

  • Number of lanes: 2
  • Lane width: 3.00 m
  • Carriageway width:6.00 m
  • Width of shoulder: 1.00 m (of which 0.50 m is paved)
  • Increase of shoulder on embankment: 0.50 m
  • Total road width: 9.00 m

2017 - Georgia, Secondary Road Improvement Project (map, technical description).png

Applicant/promoter/sponsor
The Ministry of Regional Development and Infrastructure
Investment amount
Tentative estimate of $80.00 million
Implementation schedule
Planned 2017
Status
Feasibility study completed
Expected impacts on transport, environment, social, other
It is envisioned that this road, when improved, will enhance connectivity to a number of towns and villages at the foothills of the mountain ranges and can act as alternate route to parallel segments along E-60.
Source of Funding
ADB (Asian Development Bank)