2016-17 - Georgia, Tbilisi-Rustavi Urban Road (Tranche 2 and 3)
Road project. Tbilisi-Rustavi Road entails a four-lane urban link between Tbilisi (population: 1.2 million) and the city of Rustavi (population: 117,000.00). This road is also part of the East-West Highway connecting Azerbaijan with the Black Sea.
Technical description
18 km (three section-phases), four-lane urban link, mainly concrete road.
Applicant/promoter/sponsor
The Ministry of Regional Development and Infrastructure (Executive agency is Municipal Development Fund of Georgia)
Investment amount
Section 2 estimated cost is $70 mln.
Section 1 and 3 are completed.
Total project cost is about $100 million.
Implementation schedule
Construction time Section 1 and 3: construction has been completed. Section 2 is under bidding. Construction estimated time is 17 months. Estimated cost is $70 mln. Implementation schedule Section 2 - 2017
Status
Section 1 and 3 completed Section 2 under bidding
Expected impacts on transport, environment, social, other
Improved urban environment, local economy and better living conditions within urban areas.
Blog » 2016-17 - Georgia, Tbilisi-Rustavi Urban Road (Tranche 2, 3)
2016-17 - Georgia, Tbilisi-Rustavi Urban Road (Tranche 2, 3)
Section 1 and 3 are completed.
Total project cost is about $100 million.Section 1 and 3: construction has been completed.
Section 2 is under bidding. Construction estimated time is 17 months. Estimated cost is $70 mln.
Implementation schedule
Section 2 - 2017